Following are brief details of a selection of Avid’s recent large scale projects that demonstrate our capacity to provide custom turnkey solutions to not only meet industry standards, but to pioneer innovative solutions to meet complex specifications.

Gorgon Project Barrow Island LNG Plant: Essential Diesel Generators

Power Generation Perth Western Australia Avid Group

1 x Caterpillar 3512, 1 x Caterpillar C-32, 1 x Caterpillar 3412.

Responsibilties

  • Manufacture control panels
  • Installation of Woodward easYgen 3200-P2 for generator control
  • Electrical installation to Accoustic Enclosures
  • Factory Acceptance testing of Generators, including LoadBank and full control system functionality test
  • Allen Bradley PLC modbus communications to customer HMI

Mermaid Marine Australia: Generator Control System Upgrade

Power Generation Perth Western Australia Avid Group

3 x Detroit Diesel Engines. Upgrade generator controls to Woodward easYgen Synchronising System.

Responsibilities,

  • Fault Finding Load Sharing Issues
  • Manufacture and Supply of Control Panels
  • On-Site Electrical Installation
  • On-Site Electrical Commissioning
  • Electrical Equipment Supply
  • Drawing Modifications
  • Client Staff Training

Dual 600kW Vent Fan Upgrade

Power Generation Perth Western Australia Avid Group

Existing installation upgrade of 2 primary vent fans for an underground mine.

Responsibilities,

  • PLC Programming
  • Electrical and Control System Site Commissioning
  • Factory Acceptance Testing with Documentation
  • Site Acceptance Testing with Documentation
  • User Manual Creation

Yandi Village: Standby Generator

Power Generation Perth Western Australia Avid Group

1 x Caterpillar 3516 Diesel Fuelled Generator Set. Manufacture, Install and Commission a Control Panel for 1 x 1400kw Generator.

Responsibilities,

  • Control Panel Assembly and Electrical Equipment Supply
  • On-Site Electrical Installation of Control Panel and Equipment Supply
  • On-Site Commissioning
  • High Voltage Cabling
  • Factory Acceptance Testing
  • Site Acceptance Testing with Documentation
  • Drawing Markups
  • Control System Operational Philosophy

Caterpillar C15: Synchronising Panel Upgrade

Power Generation Perth Western Australia Avid Group

Removal of existing Caterpillar control panel and installing Woodward easYgen 3200 panel for parallel operation on 2 x Caterpillar C15 Generator Sets.

Responsibilities,

  • Design of New Control Panels Drafting
  • On-Site Installation of Supplied New Control Panels
  • On-Site Commissioning of New Control Panels
  • Factory Acceptance Testing
  • Drawings Modifications

1000t Offshore Patrol Vessel: Main Generating Sets Control & Monitoring System

Power Generation Perth Western Australia Avid Group

3 x Caterpillar C18 Marine Diesel Fuelled Generator Set Alarm and Monitoring Control Panels

Responsibilities,

  • Project Management
  • Design and Drafting
  • Manufacture of Control Panels
  • Installation and Commissioning of Control Panels, including Sensors
  • Factory Acceptance Testing with Documentation
  • Site Acceptance Testing with Documentation
  • Hardware Acceptance Testing with Documentation
  • Drawings Modifications
  • Contract Administration
  • Arrangement, Philosophy and Operation Procedures

Caterpillar 3512: Generator Enclosure Fit Out

Power Generation Perth Western Australia Avid Group

2 x 3512 Caterpillar Generator. Installation of all internal fixtures and fittings in the 2 generator enclosures, including control panel and Circuit breaker panels. A fire protection systems was also installed in both enclosures.

Responsibilities,

  • Electrical and Mechanical Installation
  • Supply of Electrical Equipment
  • Site Commissioning
  • Factory Acceptance Testing
  • Site Acceptance Testing Checks

West Kimberley Power Project

Power Generation Perth Western Australia Avid Group

The $320 million West Kimberley Power Project (WKPP) comprises five power stations – four fueled by LNG – and the LNG plant at Karratha and associated road transport infrastructure.

With an initial generating capacity of 61 MW (multiple Caterpillar G3520C, G3516C and G3412 enclosed island mode gas fired generator packages and Caterpillar and Cummins diesel fired generators), potentially growing to 92 MW over 20 years, the project is supplying electricity to more than 27,000 people in the resource-rich, but isolated West Kimberley region of Western Australia.

Avid established the Electric Generator Module (EGM) commissioning procedures and documentation for the complete project and provided the WKPP EGM commissioning manager as well as senior technicians to drive the final installation, tuning, commissioning and performance testing of the EGM mechanical, electrical and control systems across all five sites; a 22 month commitment from equipment factory testing to power stations handover.

During the course of the project, Avid was also called upon to provide additional services covering specialised hazardous area equipment installation and inspection as well as general power station construction, installation and testing.

With the WKPP stations now on line and providing power, Avid’s involvement continues in the form of specialised routine maintenance.

Phase V North West Shelf LNG Expansion: Emergency Diesel Generators

Power Generation Perth Western Australia Avid Group

1 x Caterpillar 3516B HD DITA (2000kW p.u.) and 1 x Caterpillar C18 (560kW p.u.) enclosed emergency diesel generator packages with custom local and remote control panels. Petroleum application.

Responsibilities,

  • Design
  • Electrical Installation and Equipment Supply
  • Factory Acceptance Testing
  • Site Acceptance Testing
  • Project Management
  • Senior Project Engineering
  • Contract Administration
  • Quality and Document Control
  • Commissioning Management

Exmouth Power Station Generator Sets

Power Generation Perth Western Australia Avid Group

7 x Caterpillar G3516 TA (980kW p.u.) dual fuel CNG / LPG custom generator sets with local control panels and gas trains.

  • Responsibilities,
  • Design
  • Engine and Generator Installation Modification
  • Control Panel Assembly and Electrical Equipment Supply
  • Factory Acceptance Testing
  • Site Acceptance Testing
  • Project Management
  • Senior Project Engineering
  • Contract Administration
  • Quality and Document Control

Harriet Alpha Platform: Power Generation Upgrade

Power Generation Perth Western Australia Avid Group

1 x Caterpillar G3512 DITA (794bkW p.u.) natural gas generator with stainless steel cyclone proof enclosure, two custom free standing stainless steel cyclone proof IP66 control panels (one for new generator and one for existing) and additional upgrade of existing generator control systems. Petroleum application.

Responsibilities,

  • Design
  • Electrical Installation and Equipment Supply
  • Factory Acceptance Testing
  • Site Installation
  • Site Acceptance Testing
  • Project Management
  • Senior Project Engineering
  • Contract Administration
  • Quality and Document Control
  • Commissioning Management

Ocean Legendre Platform: Power Generation Upgrade

Power Generation Perth Western Australia Avid Group

1 x Caterpillar 3406 DITA (400kW p.u.) enclosed essential diesel generator package. Petroleum application.

Responsibilities,

  • Feasibility Study